Archive

Article length: 100 words

Angola: TechnipFMC wins Zinia contract

Total E&P Angola has given TechnipFMC a contract for the 40,000 b/d Zinia Phase 2 field development on Block 17, at a water depth between 800 and 1,000 metres. The contract covers the engineering, procurement and construction of subsea equipment including nine subsea tree units as well as wellheads, subsea control systems and connection systems.

Go to full article
African Energy Gulf States Newsletter