Archive

Article length: 152 words

Cameroon: Tower prepares for drilling

Tower Resources is preparing to start drilling the Njom 3 well on the Thali licence in late May. The well will be drilled to a total depth of 1,100 metres intersecting at least three reservoir zones already identified by the Njom 1B and Njom 2 discovery wells drilled on the Njonji structure by the previous operator Total. Vantage Drilling’s Topaz Driller rig expects to complete operations in Gabon in mid-May, which should make it possible to spud the well in the last week of May, Tower said.

Go to full article

Credit value: 1

African Energy Gulf States Newsletter