Electricidade de Moçambique (EDM) invites prequalification bids by 19 June for the engineering, procurement and construction of phase 1 of the Chimuara-Nacala 400kV overhead transmission line, comprising two lots. Contractors may prequalify and bid for one or both lots and sign single or multiple contracts, according to the tender notice. The contract will be financed by the Islamic Development Bank. Lot 1 covers a 367km single-circuit 400kV line from the Chimuara substation to the Alto Molocué substation, including rerouting of existing lines.
Subscribe to African Energy