Ghana: Penspen wins FEED contract for gas network
Issue 314
- 17 Dec 2015
| 1 minute read
Bulk Oil Storage and Transportation Company Limited (BOST) has given Penspen a contract to conduct a front-end engineering design study for further development of the Ghana Natural Gas Interconnected Transmission System. BOST, as holder of Ghana’s natural gas transmission utility licence, has a mandate to operate, maintain and further develop a country-wide gas transmission network as part of Ghana’s national agenda to exploit gas as an efficient and cost-effective means of augmenting power supply. The first phase of this build-out will be the addition of approximately 750km of pipeline from Aboadze to Tema, and from Prestea to Buipe, via Kumasi.
Don't have an account?
Register for access to our free content
An account also allows you to view selected free articles, set up news alerts,
search our African Energy Live Data power projects database and view project locations on our interactive map
Register