Ghana: Penspen wins FEED contract for gas network


Issue 314 - 17 Dec 2015 | 1 minute read

Bulk Oil Storage and Transportation Company Limited (BOST) has given Penspen a contract to conduct a front-end engineering design study for further development of the Ghana Natural Gas Interconnected Transmission System. BOST, as holder of Ghana’s natural gas transmission utility licence, has a mandate to operate, maintain and further develop a country-wide gas transmission network as part of Ghana’s national agenda to exploit gas as an efficient and cost-effective means of augmenting power supply. The first phase of this build-out will be the addition of approximately 750km of pipeline from Aboadze to Tema, and from Prestea to Buipe, via Kumasi.

Tagged with:

Pin Ghana

Want to read more?

Subscribe to African Energy

View subscription options

Don't have an account?

Register for access to our free content

An account also allows you to view selected free articles, set up news alerts, search our African Energy Live Data power projects database and view project locations on our interactive map

Register