Archive

Article length: 51 words

Equatorial Guinea: APR turbines to add capacity

APR Energy has supplied and installed two 20MW TM2500 turbines to add to capacity at the 154MW Malabo Turbo Gas plant on Bioko Island. The new turbines arrived in Equatorial Guinea in early August and are expected to commission by the end of September.

Go to full article
African Energy Gulf States Newsletter