Bowleven on 11 May announced the arrival of the Topaz Driller rig in Cameroonian waters from Singapore for a two-well appraisal drilling campaign on the Etinde licence for operator New Age (African Global Energy). The IM-6 well is expected to spud at the end of May to test the potential of the Intra Isongo play opened by the IM-5 well in 2012. The Topaz Driller has been contracted for 150 days.
Tagged with:
Subscribe to African Energy