Archive

Article length: 63 words

Saudi Arabia/Kuwait: Field to resume in 2019

The Khafji oil field in the Saudi-Kuwait Partitioned Neutral Zone is to resume production in 2019, five years after Saudi Arabia stopped output, according to Japanese contractor Toyo Engineering. Toyo has agreed to a third renewal of its general engineering services agreement with the Al-Khafji Joint Operations joint venture, which it originally signed in 2002.

Go to full article
African Energy Gulf States Newsletter